Traffic Impact Assessment Study (TIA)

Comprehensive traffic impact studies for safe, efficient, and sustainable development across USA, Canada, Australia & New Zealand.
Intersection capacity and signal timing analysis map used for traffic impact assessment and congestion evaluation

What Is a Traffic Impact Assessment (TIA)?

Evaluating Development Impact on Transportation Networks

A Traffic Impact Assessment (TIA), also known as a Traffic Impact Study (TIS), is a critical engineering analysis that evaluates how a proposed development or land use change will affect surrounding traffic conditions.

Core TIA Components

Ground-Level Issues Solved by TIA

Addressing Real World Traffic Challenges

TIAs help stakeholders proactively manage traffic-related issues before development begins, ensuring smoother approvals and safer communities.
Children and pedestrians crossing a marked crosswalk at a signalized intersection as part of traffic impact analysis

Key Benefits

Autonomous electric vehicle operating on a smart city street as part of future-ready traffic impact assessment studies

Future Ready Traffic Impact Studies

Integrating Technology, Sustainability & Equity

Modern TIAs go beyond traditional traffic counts. We incorporate smart mobility, climate resilience, and equity focused planning to future-proof your project.

Innovative TIA Features

Heavy traffic congestion near a road construction zone with lane closures and barriers during traffic impact assessment

TIA for Temporary Construction Zones

Short-Term Impact Analysis for Roadwork & Infrastructure Projects

We provide focused TIA services for temporary construction zones to ensure minimal disruption and maximum safety during short-term projects.

Key Features

Why Choose PLAN MY TRAFFIC?

Client Testimonials

plan my traffic’s traffic control plan was a game-changer for our highway expansion project. Their attention to detail from lane closures to flagging operations ensured our site was safe and fully compliant with local regulations. The team’s responsiveness and expertise made the entire process seamless.

Senior Site Engineer, ARI

We needed a comprehensive TMP for a multi-phase downtown redevelopment. plan my traffic delivered a robust strategy that covered every aspect from incident management to public communication. Their plan helped us avoid delays and kept traffic flowing smoothly throughout the project.

Project Coordinator, Urban Works

Organizing a large scale music festival comes with countless logistical challenges, but plan my traffic’s event traffic management plan took a huge weight off our shoulders. Their pre event planning and guideline for on the ground coordination ensured safe access for thousands of attendees. Truly professional and reliable.

Event Director, Diversity Association

We hired plan my traffic to optimize signal timing across several busy intersections. Their adaptive strategies significantly reduced congestion during peak hours. The results were immediate and measurable; our commuters noticed the difference!

Transportation Manager, Fort Leee

plan my traffic’s TIA report was instrumental in getting our mixed use development approved by the city. Their data-driven approach and clear mitigation strategies impressed both our team and the municipal planners. We’ll definitely be working with them again.

Lead Planner, SMC

Traffic Management Plans (TMP) & Strategies

An engineering study evaluating how a development affects the surrounding transport network.
Often used interchangeably; both analyze traffic impacts.
Municipalities, planning authorities, and developers seeking permits.
Significant traffic increase, road access changes, or proximity to sensitive infrastructure.
Trip generation forecasting, intersection evaluation (LOS), mitigation recommendations, and permit-ready reports.
Yes, we provide short-term impact analysis.
USA, Canada, Australia, New Zealand.
Site plan, proposed land use, trip generation, road network details.
2 to 6 weeks.
Yes, we assist with submissions to planning boards.
No, but we offer recommendations.
Yes, we integrate smart mobility and sustainability.
DDSA, AI/Machine Learning, IoT Sensors, Multimodal Planning.
Contact for a custom quote.
Yes, seamless integration with TMPs and TO strategies.
Submit project details via our quote form.
Scroll to Top