Winnipeg traffic plans designed to City of Winnipeg standards, with Manitoba Infrastructure coordination when a corridor touches provincial highway jurisdiction. Reduce revisions, avoid crew downtime, and move toward lane-closure, permit, and right-of-way approvals faster
No obligation. City-compliant
Lane closures, flagging operations, shoulder work, road closures, and utility work zones. Site-specific drawings ready for permit submission in Winnipeg.
Multi-phase plans for larger infrastructure, road reconstruction, or utility corridor projects. Includes Designated Construction Zone (DCZ) documentation for Winnipeg and provincial highways.
Traffic plans for festivals, marathons, parades, and public events in Winnipeg. Includes road closure layouts and Use of Street permit support documentation.
Planning for Winnipeg snow, ice, freezing rain, high winds, and reduced winter visibility.
Work zone planning for Pembina Highway, Portage Avenue, Route 90, and all Regional Streets.
Designed around Winnipeg MTTC 2022 and City of Winnipeg traffic control expectations.
Not sure what you need? Submit the form — we’ll guide you in the first reply.
Submit the project address, timeline, closure type, and road locations through the simple online form — takes under 2 minutes.
The submission receives a thorough review, returning a transparent, flat-rate quote within 1 business hour.
Acquire a permit-ready PDF package, fully compliant with Winnipeg MTTC 2022 and City of Winnipeg engineering standards.
Pricing depends on the type of road, closure setup, work duration, traffic impact, and whether the project needs extra details such as detours, pedestrian routing, cyclist access, or provincial coordination. A simple short-term lane closure usually costs less than a multi-phase project on a busy Winnipeg corridor.
Yes. For many standard lane closures, utility works, road closures, and short-term construction projects, we can prepare the plan quickly once the project details are received. If your work is urgent, send the address, dates, closure type, and road impact so we can confirm the fastest turnaround.
Yes. Winnipeg traffic control plans are prepared around City of Winnipeg traffic control expectations, Winnipeg MTTC 2022 guidance, lane closure requirements, and relevant street-use needs. If the work area connects with a provincial highway corridor, Manitoba Infrastructure coordination may also be considered.
You can send the project address, work dates, type of work, affected lanes or sidewalks, road names, closure timing, and any permit instructions you already have. If something is missing, our team can review the request and tell you what is needed before preparing the plan.
If the closure area, staging, detour, pedestrian path, cyclist route, or traffic setup changes, the plan may need to be revised. Updating the drawing early helps avoid confusion during permit review, field setup, or work zone coordination.
Submit your Winnipeg project details and get a clear quote within minutes.
No obligation. City-compliant